N228bn Oil, Gas Fabrication Facility Rots In Lagos Creek
An oil and gas drilling and production fabrication facility worth $600 million (about N228 billion) is lying to rot in the creeks of Lagos.
The facility, owned by Kaztec Engineering, is at Snake Island where the Badagry...